Books and Papers
Perda, G.; Morelli, L.; Remondino, F.; Fraser, C.; Luhmann, T. (2024):
Analyzing marker-based, handcrafted and learning-based methods for automated 3D measurement and modelling. Optical 3D Metrology Workshop, Brescia
Sheikholeslami, Mohammad Moein; Kamran, Muhammad; Wichmann, Andreas; Sohn, Gunho (2024):
CornerRegNet: Building Segmentation from Overhead Imagery Using Oriented Corners in Deep Networks. Proceedings of the IEEE International Geoscience and Remote Sensing Symposium (IGARSS)
Presentations
Willemsen, T. :
Untersuchungen zur laserbasierten photogrammetrischen Erfassung von Schweißnähten unter Wasser.
DVS Congress 2013, Essen,
September 2013
Jaquemotte, I.
:
Die Stadt in 3D – Modellierung und Präsentation.
Deutscher Kartographentag, Dresden,
August 2013
Luhmann, T.
:
High-resolution Multisensoral Image Acquisition and Analysis for Energetic Building Monitoring (HiReSens).
University of Agriculture, Krakau, Polen,
Juni 2013
Luhmann, T.
:
Research Activities at IAPG.
Czech Technical University, Prag, Tschechien,
Juni 2013
Jaquemotte, I.
:
Technikinteresse fördern mit GIS.
9. GIS-Ausbildungstagung, Potsdam,
Juni 2013
Projects
The aim of the PhD project is to develop an innovative approach for detection of the dynamic states of rotor blades during operation without contact and targeting
more
Unterwasser-Robotik
2014-2015
The aim of this Ph.d. project was the design and implementation of a system for monitoring of continuous phenomena by sensor data streams. A major focus was the use of methods from the field of geostatistics.
more
Bachelor & Master Theses
Auswertung und Analyse von zeitlichen Phasendifferenzen eines Einfrequenz-GPS-Empfängers für die Seegangskorrektur in der Hydrographie (2002/2)
supervisors
Prof. Dr. Jörg Reinking
Prof. Dipl.-Ing. Gerd Müller
Zur Ortung von Ferngasleitungen und Dükervermessung (2002/2)
supervisors
Prof. Dipl.-Ing. Gerd Müller
Untersuchungen zum Einsatz eines neuen optischen Tastsystems in der Formmesstechnik (2002/2)
supervisors
Prof. Dr.-Ing. Hero Weber
Vermessungsbegleitende Arbeiten im Gleisbau "Duckwitzstraße" in Bremen (2002/2)
supervisors
Prof. Dr.-Ing. Jörg Mucke
Prof. Dr.-Ing. Hero Weber
Bauwerksinspektionsmessung an der Schleuse Schlüsselburg (2002/2)
supervisors
Prof. Dipl.-Ing. Gerd Müller